via ENENews.com / Sep 18, 2013 / We have been conducting an on-site inspection for seismic safety evaluation on the exhaust stack for Units 1 and 2 at Fukushima Daiichi NPS. Today (on September 18), in the inspection, we found fracture-like traces on steel members (diagonal bracings) of the exhaust stack (pictured). Since the area around the exhaust stack includes a location with a high dose rate, we will start … Continue reading →
Continue reading