Possible dates for the next SCE/CEP meeting & workshop on Nuclear Waste may be Jan 27 or the 28

sanonofrecaskloadingintostoragebunkerA number of CEP members have expressed a strong interest in returning to the matter of long-term spent fuel storage early in 2015. We are fortunate to have been approached by the Washington DC-based Bipartisan Policy Center (BPC) to organize a joint meeting with the CEP in January as part of an 18-month effort to generate action on the movement of used nuclear fuel in the U.S. With the short timeframe, we will need to finalize the event very quickly.
BPC is working on an initiative, “America’s Nuclear Future: Taking Action to Address Nuclear Waste,” to reinvigorate and expand the discussion on nuclear waste, identify barriers inhibiting progress on nuclear waste, and explore options to break through the barriers. The effort is being run by Tim Frazier who previously ran the President’s Blue Ribbon Commission on America’s Nuclear Future. I am mindful that a joint program with the BPC will be far more impactful than a program that we might endeavor to execute on our own.
Important to the BPC effort are regional meetings to identify and discuss the barriers to moving forward on nuclear waste and potential actions to remove the barriers. BPC has hosted meetings in the Northeast at MIT in June, in the Southeast at Georgia Tech in Atlanta in September, and in the Midwest in Chicago in November. A joint BPC/CEP meeting for Southern California is planned for the evening of Tuesday, 27 January, or Wednesday the 28th.
 Meeting Overview
Plans include two panel discussions. The intent is to present a range of viewpoints and panelists are to be announced. The first panel will focus on federal issues as facilitated by Tim Frazier. David Victor will chair a second panel discussion with a focus on San Onofre and state issues. The second panel discussion will include the full CEP, a facilitated public comment period, and serve as our Regular Meeting for 1Q 2015.
The doors are opening wider on our discussion of Nuclear Waste at San Onofre. Once again we have the opportunity to bring this topic forward on to the national stage. The question is will you join us? Only you can make your voice heard.
Aging Nuke Dumps On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

Possible dates for the next SCE/CEP meeting & workshop on Nuclear Waste may be Jan 27 or the 28

sanonofrecaskloadingintostoragebunkerA number of CEP members have expressed a strong interest in returning to the matter of long-term spent fuel storage early in 2015. We are fortunate to have been approached by the Washington DC-based Bipartisan Policy Center (BPC) to organize a joint meeting with the CEP in January as part of an 18-month effort to generate action on the movement of used nuclear fuel in the U.S. With the short timeframe, we will need to finalize the event very quickly.
BPC is working on an initiative, “America’s Nuclear Future: Taking Action to Address Nuclear Waste,” to reinvigorate and expand the discussion on nuclear waste, identify barriers inhibiting progress on nuclear waste, and explore options to break through the barriers. The effort is being run by Tim Frazier who previously ran the President’s Blue Ribbon Commission on America’s Nuclear Future. I am mindful that a joint program with the BPC will be far more impactful than a program that we might endeavor to execute on our own.
Important to the BPC effort are regional meetings to identify and discuss the barriers to moving forward on nuclear waste and potential actions to remove the barriers. BPC has hosted meetings in the Northeast at MIT in June, in the Southeast at Georgia Tech in Atlanta in September, and in the Midwest in Chicago in November. A joint BPC/CEP meeting for Southern California is planned for the evening of Tuesday, 27 January, or Wednesday the 28th.
 Meeting Overview
Plans include two panel discussions. The intent is to present a range of viewpoints and panelists are to be announced. The first panel will focus on federal issues as facilitated by Tim Frazier. David Victor will chair a second panel discussion with a focus on San Onofre and state issues. The second panel discussion will include the full CEP, a facilitated public comment period, and serve as our Regular Meeting for 1Q 2015.
The doors are opening wider on our discussion of Nuclear Waste at San Onofre. Once again we have the opportunity to bring this topic forward on to the national stage. The question is will you join us? Only you can make your voice heard.
Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

Premature Failure of U.S. Spent Nuclear Fuel Storage Canisters

In a nutshell all we are saying is that this process should be slowed down to ensure the best possible choice of dry cask canisters is made, spend the money wisely “once” to avert another steam generator type disaster and ensure the safety of California’s future. Gene Stone &  Donna Gilmore.

Premature Failure of U.S. Spent Nuclear Fuel Storage Canisters
The California Public Utility Commission (CPUC) should delay funding the new San Onofre dry cask storage system until Southern California Edison provides written substantiation that the major problems identified below are resolved. 
San Onofre’s Chief Nuclear Officer, Tom Palmisano, told the California Senate Energy, Utilities and Communications Committee on August 12th that Edison plans to decide in August or September on a dry cask system vendor. The dry casks systems Edison is considering may fail within 30 years or possibly sooner, based on information provided by Nuclear Regulatory Commission (NRC) technical staff. And there is no technology to adequately inspect canisters and no system in place to mitigate a failed canister.
Edison created an artificial date of June 2019 to have all the spent fuel assemblies loaded into canisters. We don’t need to rush into another “steam generator” like boondoggle.  Edison’s Tom Palmisano told the California Senate Energy, Utilities and Communication Committee on August 12th that issues regarding high burnup fuel and dry cask storage have been addressed. However, these issues have not been resolved.
Canisters may need to be replaced within 30-42 years or sooner. 
Recent information provided by the NRC technical staff indicates dry storage canisters may need to be replaced within 30-42 years or sooner, due to stress corrosion cracking of the thin (1/2 to 5/8 inch) stainless steel canisters (due to our coastal environment). Similar stainless steel materials at nuclear plants have failed within 16 to 33 years.  The concrete overpacks also have aging issues that are accelerated in coastal environments.                                          sanonofrecaskloadingintostoragebunker
Southern California Edison has budgeted $400 million dollars for the dry storage system. As Commissioner Florio stated after the recent CPUC meeting in Costa Mesa, “We don’t want to have to buy these again.”
No remediation plan to repair or replace failed canisters.
The NRC stated that if one of the canisters becomes defective (e.g. 75% through-wall stress corrosion cracks), there is no way to repair or replace the canister; especially if the spent fuel storage and transfer pools are demolished, as Edison plans to do. And before a canister can be transported (inside a transport cask), the canister must not have cracks.
No technology to adequately inspect canisters for stress corrosion cracking.
The NRC states technology does not exist to adequately inspect steel canisters for stress corrosion cracks or to measure how or when the cracks will go through the wall of the canister. They plan to allow the nuclear industry 5 years to try to develop technology. And then they only plan to require inspection of one canister at each nuclear plant.  
No license renewals until aging management issued addressed.
The NRC is in the process of developing an aging management plan due to the new requirement that dry storage systems need to last 100 to 300+ years. They are delaying license renewals until unresolved aging management issues can be addressed. However, they plan to allow the NUHOMS 32PTH2 canister that Edison may procure to be included in an existing license. The NRC is evaluating how long dry storage systems will last. Previously, they only needed to last 20+ years with the assumption there would be a permanent repository.
No canisters approved for high burnup fuel for more than the initial 20 years.
The NRC has not extended licenses past the initial 20 years for storage of high burnup fuel (>45GWd/MTU) due to unknowns about high burnup fuel in storage and transport. This fuel is over twice as radioactive and hotter than lower burnup fuel.  The NRC has allowed nuclear plants to burn fuel longer, without the research to show that it is safe in storage and transport. The protective fuel cladding can become brittle and crack; resulting is higher risk for radiation exposure, if the canisters fail.
NUHOMS dry canister license certification expires in less than nine years.
The NUHOMS DSC-32PTH2 canisters that Edison wants to procure are not yet licensed by the NRC. If approved, the license will expire in less than nine years (February 5, 2023), since Areva-TN decided to avoid a new license certification and include it in their existing license for the DSC-24PT series, which has a different design.
New design of the NUMHOMS DSC-32PTH2 eliminates failed fuel cans.  
Unlike the existing 24 fuel assembly canisters, the new 32 fuel assembly canisters have no provision for Failed Fuel Cans. This means damaged fuel assemblies (of which San Onofre has many) cannot be used in the DSC-32PTH2 canisters. The NRC and DOE require fuel assemblies to be retrievable so they can be transferred to other containers. The Failed Fuel Cans met this requirement.
Background
On July 14th, 15th and August 5th the NRC had public meetings to address aging management issues with dry cask storage system. Their goal is to require an aging management plan before relicensing or issuing new licenses, now that the NRC knows on-site or interim dry cask storage will be needed for up to 300 years or more. The NRC stated the earliest date for a permanent repository is 2048 and that is optimistic. They are researching on-site and interim dry cask storage requirements for 40,100, 150 and 300+ years. No NRC canisters are certified for extended storage or for geological repository storage. Canister licenses for the more dangerous and unstable high burnup (>45GWd/MTU) spent fuel have not been renewed for more than the initial 20 year license, even for expired licenses. And the NRC’s Bob Einziger states there are still transportation problems with high burnup fuel. NRC staff plan to have a draft for public comment regarding dry cask storage relicensing by the end of 2014, according to Mark Lombard, Director, Division of Spent Fuel Storage and Transportation. However, this will not address our current issues.
Stainless Steel Dry Canister Problems
Darrell Dunn, an NRC materials engineer, stated stainless steel dry storage canisters are vulnerable to failure within about 25 – 42 years. If any of the fuel cladding in the canister fails, there is no protective barrier and we could have a serious radiation release. The NRC said they have no current mitigation plan for that consequence.  They suggested we MIGHT be able to put the fuel back in the spent fuel pool.  However, Edison plans to destroy the spent fuel and transfer pools. And there is no technology to repair the canisters. The NRC said they HOPE there will be a solution for mitigation in the future. Even an NRC May 2nd High Burnup Fuel letter admits there are mitigation problems.
No Inspections of Stainless Steel Canisters
To make matters worse, these stainless steel canisters are not inspected after they are loaded into the unsealed concrete overpacks (Areva NUHOMS) or concrete casks (Holtec and NAC Magnastor).  The NRC proposed having each nuclear plant inspect the outside of only ONE stainless steel canister before they receive a license renewal and then do that once every 5 years.  The industry balked at having to even check one canister at every plant. The problem with the stainless steel canisters is they do not protect against gamma rays; so it’s not a simple task to remove a canister from the concrete overpack/cask to examine the exterior for corrosion or other degradation. And since welded canisters do not have monitoring for helium leaks, we may not have any warning of an impending radiation release. 
Concrete Overpack Corrosion Problems
Darrell Dunn discussed serious corrosion problems with the concrete overpacks/casks, especially in coastal environments.   
Ductile Cast Iron Casks may be a better solution
Asked if San Onofre would be better off using ductile cast iron casks like the CASTOR, due to our coastal environment, Aladar (Al) Csontos, NRC Branch Chief in the Division of Spent Fuel Storage and Transportation (SFST), said that might be a better option near the ocean. Casks, such as CASTOR, may eventually have aging issues with bolts and seals. The CASTOR has double sealed lids, so even if one fails, we’ll still have a sealed canister. And Edison would be able to easily monitor for cask material degradation with all the casks.
The NRC licensed the CASTOR V/21 ductile cast iron cask years ago and the cask is still in use. In fact, a CASTOR V/21 was used to prove low burnup fuel is safe to store for over 15 years. However, none of the current U.S. cask designs have been tested even though they use a different storage technology.  The U.S. industry chose a different technology (stainless steel/concrete overpack/cask) mainly due to the cost of ductile cast iron at the time and with the assumption that the canisters would only be needed until Yucca Mountain opened. The CASTOR V/21 was considered the “Cadillac” of the industry and the CASTOR line is still very popular in other parts of the world for BOTH storage and transport (including high burnup fuel). The CASTOR canisters have multiple certifications for quality manufacturing, unlike the U.S. stainless steel canisters that are allowed exceptions to ASME and other standards. Material prices for stainless and cast iron have changed, so the price point should be lower.
The CASTOR has pressurized lid monitoring to detect helium leaks and temperature changes. The welded U.S. canisters do not have this capability, but the NRC and Department of Energy (DOE) state this is a high priority issue to resolve.
The inside of the CASTOR cask, including the sealing surface, has a nickel coating for corrosion protection. On the outside, the cask is protected by an epoxy resin coating in the fin area and nickel coating elsewhere.  And unlike the U.S. stainless steel canisters, it does not have stress corrosion cracking issues and does not require a concrete overpack/cask.
The original CASTOR V/21 is almost 15″ thick as opposed to the 1/2″ to 5/8″ stainless steel canisters.  The newer model CASTOR V/19 is almost 20″ thick. There are other ductile cast iron canister brands that are used in other countries. However, the U.S. emphasis on cost rather than longer term safety discourages competition from better quality casks vendors. With new U.S. needs for longer term onsite and interim dry cask storage, this should change.
Forged Steel Casks (AREVA TN Series)
Areva makes thick walled forged steel casks (TN series), which were approved for limited use years ago by the NRC. The TN cask is much thicker than the stainless steel canisters and doesn’t require a cement overpack/cask.  Its specifications are not as robust as the CASTOR, but better than the Areva NUHOMS system that Edison may procure.  Fukushima Daiichi and Germany use some TN casks. Germany mainly uses the CASTOR casks. 
Enclose Casks in Buildings
Both Japan and Germany enclose their casks in buildings for protection from the environment and other external forces. This is something Edison should consider.
Action Needed
No dry cask solution is even close to perfect, but we need to buy ourselves as much time as possible. Given the issues with stress corrosion cracking, concrete degradation, lack of monitoring, and lack of external inspection of stainless steel canisters, we can do better. Spent fuel pools are dangerous. However, the spent fuel needs to cool in the pools for a number of years, so we have time to do a better job selecting a dry cask storage system. Edison’s artificial deadline of June 2019 to have all canisters loaded should not be the driving factor for the future of California.
The NRC does not proactively research dry storage system designs. They only respond to vendor requests for licensing. Vendors will only do this if they think they have a customer lined up for their product. California needs to be that customer. 
Edison should reopen the bidding to include vendors with other cask technology. Edison’s Community Engagement Panel (CEP) had a presentation from Areva, but from no other dry cask storage vendors. Edison only solicited bids from three canister system manufacturers who all have the problems mentioned in this document. Edison requested the NRC approve the NUHOMS 32PTH2 design – it was not licensed when they decided to use it. That license amendment (Docket No. 72-1029, Certificate of Compliance No. 1029 Amendment No. 3) may be approved in August.  However, the CPUC should not approve funding for this canister system.
Edison has not shared with us the documents they used to solicit bids (Request for Proposal), so we have no idea what the requirements are in that bid package.  That would be useful information and the public should have access to this information.
If you have questions about sources for any information, contact Donna Gilmore. There are also detailed references on the SanOnofreSafety.org website.  A link to the NRC July and August presentations as well as other documents discussed here are on the following pages.
Donna Gilmore                                            
SanOnofreSafety.org                                  
949-204-7794, dgilmore@cox.net 
Gene Stone
Residents Organized for a Safe Environment (ROSE)                              
Member, SONGS Community Engagement Panel
949-233-7724, genston@sbcglobal.net
References
High Burnup Fuel
High Burnup Nuclear Fuel −Pushing the Safety Envelope, M. Resnikoff, D. Gilmore, Jan 2014  http://sanonofresafety.files.wordpress.com/2014/01/hbffactsheet01-09-2014.pdf
Response from Donna Gilmore to NRC regarding May 2, 2014 request for NRC high burnup fuel technical basis, June 25, 2014
NRC Presentations
NRC Meeting to Obtain Stakeholder Input on Potential Changes to Guidance for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance, July 14th/15th, 2014 (includes slide presentations)
Chloride-Induced Stress Corrosion Cracking Tests and Example Aging Management Program, Darrell S. Dunn, NRC/NMSS/SFST, Public Meeting with NEI on Chloride Induced Stress Corrosion Cracking Regulatory Issue Resolution Protocol, August 5, 2014
CASTOR Dry Casks (Ductile cast iron cask technology)
CASTOR V/21 NRC Certificate of Compliance and Safety Analysis Report, August 17, 1990   http://pbadupws.nrc.gov/docs/ML0330/ML033020117.pdf
CASTOR brochure (includes the CASTOR V/19 and other ductile cast iron casks).
GNS’ [CASTOR] experience in the long-term storage at dry interim storage facilities in Ahaus and Gorleben, IAEA Vienna, May 20, 2014  http://bit.ly/1jUSNOZ
Spent Fuel Storage and Transportation Experience, Idaho National Engineering Laboratory (GNS Castor V/21, Transnuclear TN-24P, Westinghouse MC-10, NAC S-100-C), 1987
BAM test results for CASTOR transport containers
Fracture Mechanics Based Design for Radioactive Material Transport Packagings, Historical Review, Sandia SAND98-0764 UC-804, April 1998http://www.osti.gov/scitech/servlets/purl/654001
GNS CASTOR Presentation, June 09-11, 2010, Varna, Bulgaria (slide 18: CASTOR V/19, V52)
Areva TN Series Casks (forged steel cask technology)
TN-24 NRC Certificate of Compliance and Safety Analysis Report, November 4, 1993
AREVA Innovation in the Design of the Used Fuel Storage System, CRIEPI Tokyo, November 15-17, 2010 (includes information on TN 24 casks)
AREVA Dual Purpose Casks in Operation, AREVA TN Experience, Vienna, May 19-21, 2014 http://bit.ly/1l9xO5R
NUHOMS 32PTH2 and San Onofre Decommissioning Plans
NRC Certificate of Compliance for Spent Fuel Storage Casks, COC 1029, Docket 72-1029, Amendment 3, Model No. Standardized Advanced NUHOMS®-24PT1, 24PT4, and 32PTH2,  expires 02/05/2023 (pending NRC approval as of 8/20/2014)
Comments on Direct Rule re List of Approved Storage Casks (79 Fed. Reg. 21,121 (April 15, 2014), Request for Rescission of the Direct Rule, and Request for Publication of a New and Revised Notice of  Proposed Rulemaking, Docket No. 13-0271, Diane Curran, on behalf of 20 environmental organizations and individuals.
February 10, 2012 letter from Edison to NRC: Support for NRC Review of Transnuclear Inc. Application for Amendment 3 to the Standardized Advanced NUHOMS® Certificate of Compliance No. 1029, San Onofre Nuclear Generating Station, Units 2 and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-36, 50-362 and 72041
Update on Decommissioning Plans, Tom Palmisano, Vice President & Chief Nuclear Officer, August 12, 2014 presentation to CA Senate Energy, Utilities and Communications Committee, Chairman Alex Padilla
Community Engagement Panel Correspondence
High Burnup Fuel and Dry Cask Storage Issues, July 17, 2014 letter to CEP Chairman David Victor from Donna Gilmore, San Onofre Safety
David Victor testimony to NRC Commissioners, July 15, 2014
Additional references at SanOnofreSafety.org
Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

2 ACTION ALERTS NEED YOUR COMMENTS!

1st ACTION ITEM;

Please write to all the NRC Commissioners in support of the Chairperson MacFarlane idea to update the NRC Regs in a effort to make it clear for all Plant owners and the public on the decommissioning process for nuclear plants and the handling of “HBF” (high burn fuel). Please ask the Commissioners to have the NRC open a old cask with HBF in it to check on condition of this highly dangerous fuel and the cask condition.

Here are the email address:
Chairman@nrc.gov
CMRSVINICKI@nrc.gov
CMRMAGWOOD@nrc.gov
CMROSTENDORFF@nrc.gov

2nd ACTION ITEM;

THE EPA WOULD LIKE YOUR COMMENTS! DEADLINE AUGUST 3rd.
Both proponents and opponents of nuclear power expect the
Environmental Protection Agency in coming months to relax its rules
restricting radiation emissions from reactors and other nuclear
facilities. EPA officials say they have no such intention, but they
are willing to reconsider the method they use to limit public
exposure—and the public’s level of risk. Comment by August 3, 2014.
The EPA is seeking public input here http://www.regulations.gov/#!documentDetail;D=EPA-HQ-OAR-2013-0689-0001 upper right corner “comment now”.

Thanks for your activism.

Sincerely,

Gene Stone, ROSE

Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

Recommendations for temporary storage of Nuclear Waste at San Onofre


How long will SONGS be a Nuclear Waste Dump? That answer is unclear at best. But for sure it will be here longer than anyone wants. So it will be safest and cheapest to store it right the first time! SCE and NRC love’s to say the risks are small, but they don’t like to tell us how BIG a nuclear waste accident can be. Anyone remember Chernobyl and Fukushima?

ROSE advocates relocation of nuclear waste as soon as is feasible from the SONGS site to a less populated area and a less earthquake prone area. Temporary or permanent, although a permanent situation is preferred.

1. Storage of dry cask of any type should be within it’s own building to protect them from the salt air at San Onofre as some other countries do .
2. The best canister we have seen is the V-19 German canister. (The V-19 and 21 canisters are an example of a better made product for our site at San Onofre. It was not meant to be a recommendation to buy, just the type of construction method we may want to look at.)
3. There should be a fuel pool with crane on site to mitigate any accident with any of the dry casks.
4. There should be some type of pressure or radiation monitoring of cask in real time which the V-19 canister has.
5. NRC needs to update it’s procedures to include inspections of decommissioned cask storage areas on a regular and timely basis.
6. DOE needs to set a firm date as to when they will takeover SONGS nuclear waste and exactly how they will do that.

Donna Gilmore talking about dry cask storage for San Onofre Nuclear (Waste) Generating Station 

http://www.youtube.com/watch?v=xLr0WR5oSjU

By Gene Stone

Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

To all who will help make California safe for our children’s future

To all who will help make California safe for our children’s future,Public meeting of the new SCE CEP (Community Engagement Panel) about the decommissioning of SONGS will be Tuesday, March 25 from 6 to 9 p.m. . The meeting will be held a…

Continue reading

Moving forward with Decommissioning San Onofre

“ROSEMEAD, Calif. June 7, 2013 Southern California Edison (SCE) has decided to permanently retire Units 2 and 3 of its San Onofre Nuclear Generating Station (SONGS).”

 It was a great day for many individuals and groups who had come together to work for the greater good and safety of their communities.  From LA to SD and points in between, and in fact across the nation.  At times it was more than interesting to watch so many different individual opinions and ideas and methods coalesce to work together.  The Angeles chapter Sierra Club, Peace Resource Center of SD, San Onofre Safety, Decommission San Onofre, San Clemente Green and ROSE, these working groups & individuals became known as the “Coalition to Decommison San Onofre”.  It was like the universe itself had appointed this time and place for these people and groups to come together and develop a vortex of energy for the purpose of speaking truth to power about the extreme dangers sitting on the California coastline at San Onofre known as San Onofre Nuclear Generating Station (SONGS). Please believe me when I say it was not any one individual or one single group that did this alone. It was in fact everyone who informed themselves on the issues, worked, organized, prayed, donated time and money and showed up to speak at meetings all around Southern California. I am sure these coalition members and individuals are committed to staying strong and working for the continued good of the community.   It seemed this time and place was appointed by something beyond ourselves.

While I was hoping to take some time off to see the grandkids, finish some art pieces, and maybe take care of my health, California Edison called saying we would like someone from the anti-nuclear perspective to sit on their new Community Engagement Panel (CEP) for the decommissioning of SONGS, and would I as founder of ROSE do it? I had hoped as we all did that others from our highly energized coalition would be represented on the new CEP.  At first I reluctantly said yes. But after thinking about it I can only hope that the universe has made a new appointment for us to help develop a new vortex of energy with the new CEP for the safe, sane and economical decommissioning of units 2 and 3 and the safest storage and removal in time of the extremely dangerous toxic nuclear waste sitting near our homes, and finally to restore the land to the pristine conditions for the future generations of Californians to come.

Residents Organized for a Safe Environment (ROSE) Response and Pledge to SCE’s statement of core principles and values for the decommissioning of San Onofre.

ROSE is pleased to see the SCE “Statement of core principles and values for the decommissioning of San Onofre” and is happy to sit on the Community Engagement Panel (CEP) with other community members. ROSE pledges to Southern California residents & SCE to help Southern California Edison keep these principles and core values alive every step along the way during this process. ROSE pledges to help SCE become a model for the nuclear industry in safe and sane decommissioning of our nation’s dangerous and aging nuclear fleet. ROSE pledges to stand for cleaning the SONGS site of radiation to the best degree possible in the most economical way for the ratepayers. ROSE pledges to stand for worker safety in all areas of decommissioning of San Onofre. ROSE pledges to help SCE understand and use best practices in the process even if we have to rethink them. ROSE pledges to stand for the removal of all radioactive materials from the site as soon as it is possible and restore this site to its natural condition.

It is clear that DOE and NRC studies pertaining to the storage of San Onofre’s High Burnup fuel have not been completed at this point in time, and the best practice for dealing with this extremely high radioactive fuel and the timeframe for doing so is unclear and has no consensus in the community and scientists working on this problem.

I hope other members of the newly appointed CEP will join me in this Pledge to the future of all Californians and the many generations to come.

Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading

Symposium on Decommissioning San Onofre and the Ongoing Dangers of Nuclear Waste

San Onofre, the risks live on                                                             Our Coa…

Continue reading

How to support the “Nuclear Waste Symposium”

Please support our Nuclear Waste Symposium today

Two months ago, civic and environmental activists won a big victory in shutting down the San Onofre nuclear plant. It may seem that all is now quiet in San Onofre land – but it is not. Our Coalition to Decommission San Onofre has been startled by the huge challenge in dealing with radioactive nuclear waste at the plant. The issues include: unusually potent forms of fuel, dense storage of spent fuel far beyond design limits, large uncertainties about where the waste will ultimately be stored and for how long, and last but not least, the economics of decommissioning. These issues were below the radar during the shutdown debate but now they loom large.
We are organizing a symposium for October featuring highly-regarded national experts on the key issues, with plenty of time for questions to panelists and group discussion. Our immediate goal is to assure that best practices will be applied to minimize the risk for those who must live with San Onofre as a nuclear waste dump. Our ultimate goal is to reinvigorate the national discussion about what to do with America’s radioactive nuclear waste.  
Our target date is Oct 19, 2013. We need your help to make sure this important symposium comes to life. Please take moment right now to make your tax deductible donation today at paypal https://www.paypal.com/cgi-bin/webscr?cmd=_s-xclick&hosted_button_id=5K6JAPS2EGU4W   Based on necessary expenses for the event, our fund-raising goal is $9000. We have received $1000 as challenge grant from Glenn Pascall to start us off. Anyone who matches or exceeds this generous gift will be invited to join us for dinner afterwards with coalition leaders and with national experts who are our invited guest speakers. Any amount is welcomed.  If you prefer to write a check you can send to my address at 1203 Via Presa, San Clemente CA. 92672 using the name “Coalition to Decommission San Onofre”, bottom, bottom left under memo please write “Nuclear Waste Symposium”.
Our coalition member groups include: Peace Resource Center of San Diego, Citizens Oversight Project, Sierra Club Angeles Chapter, Women Occupy San Diego, San Clemente Green, San Onofre Safety, and Residents Organized for a Safe Environment (ROSE).
Gene Stone
Residents Organized For a Safe Environment (ROSE)
http://residentsorganizedforasafeenvironment.wordpress.com/
Aging Nuke Plants On Fault Lines In Tsunami Hazard Zones = Fukushimas… Any Questions?
PLEASE Turn off a light for Fukushima USA / San Onofre

Continue reading