NRC Violating Presidential Directive and the Public Trust

SCE’s PR Machine Is Capable Of Overcoming ALL Hurdles,

Except Good Science And Safety

Albert Einstein also described INSANITY as

Doing the same thing over and over again and expecting different results. 

The DAB Safe…

Continue reading

NRC Violating Presidential Directive and the Public Trust

SCE’s PR Machine Is Capable Of Overcoming ALL Hurdles,

Except Good Science And Safety

Albert Einstein also described INSANITY as

Doing the same thing over and over again and expecting different results. 

The DAB Safe…

Continue reading

SCE’s News Years Resolution 2013: Decommission SONGS ASAP

NRR RAI Answers Will Prevent Any SCE Restart At San Onofre

The NRC Office of Nuclear Reactor Regulation has requested from Edison in a
letter dated December 26, 2012, the following additional information (RAI
#32): “Please …

Continue reading

SCE’s News Years Resolution 2013: Decommission SONGS ASAP

NRR RAI Answers Will Prevent Any SCE Restart At San Onofre

The NRC Office of Nuclear Reactor Regulation has requested from Edison in a
letter dated December 26, 2012, the following additional information (RAI
#32): “Please …

Continue reading

14 Reactor Safety Questions That Edison Needs To Answer Regarding San Onofre

The 14 most important questions that the DAB Safety Team feels must be answered before the NRC, Atomic Safety Licensing Board, NRC Offices of Nuclear Reactor Regulations and Nuclear Regulatory Research can complete their investigation …

Continue reading

14 Reactor Safety Questions That Edison Needs To Answer Regarding San Onofre

The 14 most important questions that the DAB Safety Team feels must be answered before the NRC, Atomic Safety Licensing Board, NRC Offices of Nuclear Reactor Regulations and Nuclear Regulatory Research can complete their investigation …

Continue reading

Edison Pushes Restart, Despite UNSAFE Assessment

NRC No Restart at San Onofre

Steam
generator tubes and their support structures need to be extremely carefully
designed and manufactured within the allowed design tolerances.  These tubes preform a very important safety
function b…

Continue reading

Edison Pushes Restart, Despite UNSAFE Assessment

NRC No Restart at San Onofre

Steam
generator tubes and their support structures need to be extremely carefully
designed and manufactured within the allowed design tolerances.  These tubes preform a very important safety
function b…

Continue reading

Plug All Of San Onofre’s Unsafe Tubes, Not Just Some

The DAB Safety Team Agrees With Newly Released MHI Data:

Plug All Of SONGS Unsafe Tubes, Not Just Some

The DAB
Safety Team along with the support of an ever-growing number of SONGS
Concerned Insiders and Whistleblowers, prepared t…

Continue reading

San Onofre’s Unsafe Inspections Put SoCal At Risk

San Onofre Unit 2 Replacement Steam Generators Incomplete and Inadequate Tube Inspections

San Diego, CA (November 9, 2012) – The failure of eight Replacement Steam Generator (RSG) tubes (something which has never
happened before…

Continue reading

San Onofre ALMOST Caused A Nuclear Disaster

PRESS RELEASE

DAB Safety Team   November 02, 2012

Media Contact: Don Leichtling
(619) 260-0160 or Ace Hoffman (760) 720-7261

FOR  IMMEDIATE  RELEASE 

Fluid Elastic Instability
(FEI) is a phenomenon that can…

Continue reading

San Onofre ALMOST Caused A Nuclear Disaster

PRESS RELEASE

DAB Safety Team   November 02, 2012

Media Contact: Don Leichtling
(619) 260-0160 or Ace Hoffman (760) 720-7261

FOR  IMMEDIATE  RELEASE 

Fluid Elastic Instability
(FEI) is a phenomenon that can…

Continue reading

Update 10-14-12, SCE’s Replacement Steam Generator $680 Million Debacle

The DAB
Safety Team’s – Update 10-14-12,  SCE’s Replacement
Steam Generator $680 Million Debacle

1.   If SCE’s and MHI’s Engineers had used all the following
guidelines, they would have p…

Continue reading

California ISO prepares for another potential summer without San Onofre generation

News Release

News Release

For immediate release | September 13, 2012 Media Hotline ? 888.516.6397

For more information, contact:

Steven Greenlee | sgreenlee@caiso.com Stephanie McCorkle | smccorkle@caiso.com

California ISO prepares for another …

Continue reading

San Onofre Nuke Questions That Need To Be Answered By The Nuclear Regulatory Commission (NRC) Prior To The Upcoming Oct. 9, 2012 Meeting

Here are some questions for the Public and MSM Reporters to ask the NRC prior to the Public Meeting scheduled about restarting San Onofre on Oct. 9, 2012:

Has the Mitsubishi Heavy Industry (MHI) Root Cause Evaluation been completed and a…

Continue reading