Sunday, November 04, 2012
- FCNL – Nuclear Calendar Update
- NRC – Public Meeting Schedule
- Nuclear Regulatory Commission – NOTICES Exemptions: PSEG Nuclear LLC; Hope Creek Generating Station and Salem Generating Station, Units 1 and 2 Exemption Pages 66484-66486 [FR DOC# 2012-26934]
- Nuclear Regulatory Commission – NOTICES Facility Operating Licenses: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information Pages 66486-66492 [FR DOC# 2012-26762]
- Nuclear Regulatory Commission – NOTICES Petitions: Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC; Issuance of Director’s Decision Pages 66492-66493 [FR DOC# 2012-26926]
- Canada: CNSC – CNSC News Update
Saturday, November 03, 2012
Friday, November 02, 2012
- Platts – US NRC staff recommends ordering vent filters at 31 nuclear units – William Freebairn
- DOE – Stay Up To Date on Hurricane Sandy Recovery Efforts – Amanda Scott
- DOE – Secretary Chu Thanks Utility Staff and Line Workers For Their Efforts to Restore Power in the Wake of Hurricane Sandy – Jen Stutsman
- DOE – Responding To Hurricane Sandy: DOE Situation Reports – Amanda Scott
- DOE:IG – Review of the Compromise of Security Test Materials at the Y-12 National Security Complex, IG-0875
- DOE:IG – Inspection Report on “Protective Force Performance Test Improprieties,” DOE/IG-0636
- NRC – NRC Asks Exelon to Address Questions About Dresden’s Flooding Response Plan
Thursday, November 01, 2012
- Nuclear Energy Insider – Planning for tomorrow’s emergencies today – Heba Hashem
- Nuclear Energy Insider – Decommissioning the Magnox way – Skaur
- Nuclear Energy Insider – Policy Brief – 30 October 2012 – Skaur
- Nuclear Energy Insider – Weekly Intelligence Brief – 30 October 2012 – Skaur
- DOE – Responding To Hurricane Sandy: DOE Situation Reports – Amanda Scott
- NRC – NRC to Discuss Post-Fukushima “Regulatory Framework” Nov. 8 in Rockville, Md
Wednesday, October 31, 2012
- DOE – Responding To Hurricane Sandy: DOE Situation Reports – Amanda Scott
- DOE – Energy Department and Federal Efforts to Support Utility Power Restoration Efforts – Jen Stutsman
- NAS – Project Update: Review of the Department of Labor’s Site Exposure Matrix (SEM) Database
- NRC Blog – NRC Starting to Return to Normal Inspection Coverage After Sandy
- Defense Nuclear Facilities Safety Board – NOTICES Extension of Hearing Record Closure Date Page 65871 [FR DOC# 2012-26703]
- Nuclear Regulatory Commission – NOTICES Southern California Edison Company; Establishment of Atomic Safety and Licensing Board Pages 65909-65910 [FR DOC# 2012-26818]
- Nuclear Regulatory Commission – NOTICES License Amendment Requests: Westinghouse Electric Company, LLC., Hematite Decommissioning Project, Festus, Missouri Pages 65910-65912 [FR DOC# 2012-26761]
Tuesday, October 30, 2012
- DOE – Responding To Post-Tropical Cyclone Sandy: DOE Situation Reports – Amanda Scott
- DOE – Power Outages Update: Post-Tropical Cyclone Sandy – Dan Leistikow
- NAS – Project Update: – Lessons Learned from the Fukushima Nuclear Accident for Improving Safety and Security of U.S. Nuclear Plants
- NRC – NRC Starting to Return to Normal Inspection Coverage Following Sandy; Alert Remains in Effect at Oyster Creek Nuclear Power Plant
- NRC – NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains In Alert
- NRC – NRC Continues to Monitor Hurricane Sandy; Alert Declared at Oyster Creek Plant; No Plants Shut Down Due to the Storm
- Nuclear Regulatory Commission – NOTICES Notice of Sunshine Act Meetings Page 65728 [FR DOC# 2012-26741]
- Nuclear Regulatory Commission – NOTICES Applications and Amendments to Facility Operating Licenses and Combined Licenses: Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Pages 65720-65727 [FR DOC# 2012-26355]
- Nuclear Regulatory Commission – NOTICES Staff Guidances: Final Interim Staff Guidance Augmenting NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors,” Parts 1 and 2, for Licensing Radioisotope Production Facilities and Aqueous Homogeneous Reactors Pages 65728-65729 [FR DOC# 2012-26644]
- Nuclear Regulatory Commission – NOTICES Uranium Enrichment Fuel Cycle Facility Inspection Reports Prior to Commencement of Operations: Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice, NM, Prior to the Commencement of Operations Pages 65729-65730 [FR DOC# 2012-26630]
Monday, October 29, 2012
- House Committee on Energy and Commerce – Letter from DOE Regarding Funding for Yucca Mountain (posted May 2, 2012)
- NRC – NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm
- NRC – NRC Prepared for Approach of Hurricane Sandy, Stations Inspectors at Nuclear Plants Expected to be Most Impacted
- Energy Department – NOTICES Meetings: Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) Page 65542 [FR DOC# 2012-26516]
- Health and Human Services Department – NOTICES Meetings: Subcommittee for Dose Reconstruction Reviews (SDRR), Advisory Board on Radiation and Worker Health (ABRWH or the Advisory Board), National Institute for Occupational Safety and Health (NIOSH) Pages 65554-65555 [FR DOC# 2012-26495]
- UN: IAEA – Decommissioning: Every Generation’s Obligation
- UN: IAEA – Frequently Asked Questions and Answers About Decommissioning
- UN: IAEA – Decommissioning Plan for UK’s First Nuclear Power Plants Passes International Peer Review